Meet delivery deadlines
Minimize setup and inactivity times and stoppages
Maximize the use of resources and subresources
Use mathematical algorithms to obtain the best solution, enabling the usage of several optimization criteria simultaneously
Provide a graphical interface to assist the user in using and in decision making, in an intuitive, easy and comfortable way
Keep track of simulations through various Gantt charts. Stello Planner offers the user several Gantt charts that allow interacting with the planning or simply visualizing and analyzing the results of the generated scenarios
Gantt of Resources
Allows interaction and visualization of the planning, with all operations by resource and time, connections between them, general and specific data, delays, etc…
Gantt of Sub Resources
Allows the viewing of all the information regarding the different types of loads placed in the resources
Production Orders Gantt
Allows the view of their time layout, as well as information about them
Loads
Allows the viewing of all the information regarding the different types of loads placed in the resources
Easy integration with other systems
Planning is, at first sight, solving conflicts between the commercial and production departments interests. The need to make the available production capacity profitable is an opportunity to optimize resources and improve the production process. The great challenge of a planning tool is to get the quantities that have been planned to be produced in the factory